Power station Location |
Type** |
Year of commissioning |
Generation capacity (MW) |
Comment |
|
|
|
|
|
|
|
*Lagos station @ Egbin |
Thermal ST (gas) |
1985 – 1987 |
1,320 |
6 x 220 MW reheat steam turbo-electric units |
|
*Sapele station @ Ogorode |
Thermal GT, ST (gas) |
1978 - 1981 |
1,020 |
6 x 120 MW steam (ST) 4 x 75 MW GT |
|
Delta IV @ Ughelli |
Thermal GT (gas) |
1966 - 1990 |
832 ( 912 ?) |
Including 6 x 100 MW |
|
*Afam |
Thermal GT (gas) |
1978 – 1982 |
710 ( 971 ?) |
After AFAM I, II, III, IV |
|
*Ijora station Lagos |
Termal GT (gas) |
1978 |
60 |
3 units x 20 MW (2 units working)
|
|
*Oji |
Thermal ST (dual) |
1956 |
30 |
Not functional |
|
Kainji |
hydropower |
1968 – 1978 |
760 ( 580 ?) |
4 units x 80 MW 2 x 100 MW 2 x 120 MW |
|
*Shiroro |
hydropower |
1989 – 1990 |
600 |
Okay |
|
*Jebba |
hydropower |
1983 – 1984 |
570 ( 576 ?) |
6 x 90 MW |
|
|
|
|
|
|
|
Total Government |
|
|
5,902 |
|
|
|
Thermal |
|
170 |
Maximum planned is 270 MW |
|
|
Thermal |
|
30 |
|
** GT - Open Cycle Gas Turbine; ST – Steam plant
* Nigerian Electric Power Authority (NEPA) with:
• 5 transmission regions, 7 operational generating stations and 10 distribution zones
• 3 hydro power stations with combined installed capacity of 1930MW
• 6 thermal power stations with combined capacity of 3972MW
• National Grid consists of 5000Km of 330KV line major transmission subs it
• 6000Km of 132KV lines
• Transmission backbone consisting of 4,534km of 330kv lines with 19 major transmission substations
• Total major 330KV transformer capacity of 5,526MVA
SOURCES:
http://www.nepanigeria.org/structure.html
http://www.nigeriabusinessinfo.com/energy.htm
http://www.bpeng.org/10/addsector.asp?DocID=43&MenuID=38
Table 2:
New NEPA Electric Power Generating plants Being Planned
|
Project |
Capacity [Type] |
Stated Cost (US$ Mill.) |
Stated Cost (billion N) |
Gas Use (mmscfd) |
Company |
|
Ughelli,
|
150 MW [GT] |
54 |
7.6 |
? |
? |
|
Alaoji, AbiaState |
300 - 400MW [GT] |
148 |
25 ? |
130 |
? |
|
Papalanto (@ Olorunsogo),
|
335 MW [GT] |
148 |
25 |
120 |
|
|
Omotosho (@ Okitipupa),
|
335 MW [GT] |
148 |
25 |
125 |
|
|
Geregu
(@
Ajaokuta), |
414 MW [3x138MW GT] |
195 |
32 |
125 |
|
Mmscfd – million standard cubic feet per day
TABLE 3:
ELECTRICAL ENERGY PRODUCTION & CONSUMPTION (& OTHER DATA)
BY COUNTRY
[Source: CIA Fact-book Website, December 2004]
|
Country |
Population [July 2004 estimate] |
GDP (PPP) US $ Billion [2004 est.] |
GDP Per Capita (PPP) US $ [2004 est.] |
Electrical Energy Production Billion Kwh [2001 Est.] |
E. Energy Production Per Capita Bill Kwh/Million People [2001 Est.] |
Electrical Energy Consump’n Billion Kwh |
E. Energy Consump’n Per Capita Bill Kwh/Million People |
|
G-9 |
|
|
|
|
|
|
|
|
|
32,507,874 |
958.7 |
29,800 |
566.3 |
17.4 |
504.4 |
15.5 |
|
|
293,027,571 |
10,990.0 |
37,800 |
3,719 |
12.7 |
3,602 |
12.3 |
|
|
60,424,213 |
1,661.0 |
27,600 |
520.1 |
8.6 |
415.3 |
6.9 |
|
|
127,333,002 |
3,582.0 |
28,200 |
1,037 |
8.1 |
964.2 |
7.6 |
|
|
82,424,609 |
2,271.0 |
27,600 |
544.8 |
6.6 |
506.8 |
6.2 |
|
|
143,782,338 |
1,282.0 |
8,900 |
915 |
6.4 |
773 |
5.4 |
|
|
60,270,708 |
1,666.0 |
27,700 |
360.9 |
6.0 |
346.1 |
5.7 |
|
|
40,280,780 |
885.5 |
22,000 |
222.5 |
5.52 |
210.4 |
5.22 |
|
|
58,057,477 |
1,550.0 |
26,700 |
258.8 |
4.5 |
289.1 |
5.0 |
|
AUSTRALASIA-8 |
|
|
|
|
|
|
|
|
|
19,913,144 |
571.4 |
29,000 |
198.2 |
9.95 |
184.4 |
9.26 |
|
|
22,749,838 |
528.6 |
23,400 |
151.1 |
6.6 |
140.5 |
6.2 |
|
|
48,598,175 |
857.8 |
17,800 |
290.7 |
6.0 |
270.3 |
5.6 |
|
|
23,522,482 |
207.8 |
9,000 |
75.33 |
3.2 |
68.4 |
2.9 |
|
|
69,018,924 |
478.2 |
7,000 |
124.6 |
1.8 |
115.9 |
1.7 |
|
|
1,298,847,624 |
6,449.0 |
5,000 |
1,420.0 |
1.1 |
1,312 |
1.0 |
|
|
1,065,070,607 |
3,033.0 |
2,900 |
533.3 |
0.5 |
497.2 |
0.47 |
|
|
238,452,952 |
758.8 |
3,200 |
95.78 |
0.4 |
89.08 |
0.37 |
|
|
|
|
|
|
|
|
|
|
LATIN AMERICA-8 |
|
|
|
|
|
|
|
|
|
6,191,368 |
28.17 |
4,700 |
44.89 |
7.25 |
2.637 |
0.43 |
|
|
25,017,387 |
117.9 |
4,800 |
87.6 |
3.5 |
81.47 |
3.3 |
|
|
15,823,957 |
154.7 |
9,900 |
41.66 |
2.63 |
40.13 |
2.54 |
|
|
39,144,753 |
435.5 |
11,200 |
97.17 |
2.5 |
92.12 |
2.4 |
|
|
104,959,594 |
941.2 |
9,000 |
198.6 |
1.9 |
186.7 |
1.8 |
|
|
184,101,109 |
1,375.0 |
7,600 |
321.2 |
1.7 |
335.9 |
1.8 |
|
|
42,310,775 |
263.2 |
6,300 |
42.99 |
1.02 |
39.81 |
0.94 |
|
|
27,544,305 |
146 |
5,100 |
20.59 |
0.75 |
19.15 |
0.70 |
|
AFRICA-10 |
|
|
|
|
|
|
|
|
|
42,718,530 |
456.7 |
10,700 |
195.6 |
4.6 |
181.2 |
4.2 |
|
|
5,631,585 |
35 |
6,400 |
20.18 |
3.58 |
18.77 |
3.33 |
|
|
76,117,421 |
295.2 |
4,000 |
75.23 |
0.99 |
69.96 |
0.92 |
|
|
32,129,324 |
196.0 |
6,000 |
24.69 |
0.77 |
22.9 |
0.71 |
|
|
20,757,032 |
44.4 |
2,200 |
8.80 |
0.42 |
8.835 |
0.43 |
|
|
32,209,101 |
128.3 |
4,000 |
13.35 |
0.41 |
14.61 |
0.45 |
|
|
1,561,973 |
14.2 |
9,000 |
0.41 |
0.26 |
1.564 |
1.0 |
|
|
32,021,856 |
33.0 |
1,000 |
4.03 |
0.13 |
3.981 |
0.12 |
|
|
137,253,133 |
114.8 |
900 |
15.67 |
0.11 |
14.55 |
0.106 |
|
|
26,404,543 |
36.1 |
1,400 |
1.93 |
0.073 |
1.62 |
0.061 |
|
WORLD |
6,379,157,361 |
51,480.0 |
8,200 |
14,930 |
2.34 |
13,940 |
2.19 |
Table 4: Unbundling NEPA into Gencos, Transco and Discos
|
6 Generation Companies |
1 Transmission Company |
11 Distribution Companies |
|
1. Kanji / Jebba 2. Shirorro 3. Afam 4. Sapele 5. Delta 6. Egbin
|
1. National Transmission Company |
1.
2.
3.
4. Jos 5. Yola
6.
7.
8. Port- Harcourt
9.
10. Ikeja 11. Eko
|
Table 5: Summary
outline of Proposed Energy Mix for
|
Energy Option |
Amount to be Provided (Megawatts MW) |
Approx. Cost To Install (billion Naira) |
Comments (Pros & Cons) |
|
Hydro (including micro) |
20% |
? |
Without large water fall, mostly micro |
|
Thermal |
70% |
8 – 20 |
Feasible, roughly 100MW per thermal station |
|
Solar |
5%? |
? |
}Do not expect more than |
|
Wind |
5% ? |
? |
} 10% renewables total |
|
Nuclear |
0% |
0 |
General Capacity of 1000 MW too large for Ekiti needs (unless micro-) |
|
|
|
|
|
|
Total for
|
150 - 300 MW ? |
? |
Should aim for 5 to 10
times the present per capita energy production of |
|
© 1999 - 2006 Segun Toyin Dawodu. All rights reserved. All unauthorized copying or adaptation of any content of this site will be liable to legal recourse. Contact: webmaster@dawodu.com Segun Toyin Dawodu, P. O. BOX 710080, HERNDON, VA 20171-0080, USA. This page was last updated on 10/27/07. |